IS WORK OVER?

Automation index

How much of a Sound technician’s job can AI already do?

A patch and a check come earlier. Hearing it, and no feedback, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Sound technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Patch, rider and a first check.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Mix, mic and not let it feed back.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Stage, in-ears and quick changes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Artist, director and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cables, spares and strike.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not leaving a gig mute.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Patch, rider and a first check
  • Mix, mic and not let it feed back
  • Stage, in-ears and quick changes
  • Artist, director and production
  • Cables, spares and strike
  • Not leaving a gig mute
  • tecnico de sonido
  • sonidista
  • sound technician

Sources for this job· O*NET 27-4014.00· ESCO/ISCO 3521

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 589Upholsterer18%
  2. 590Taxi driver18%
  3. 591Lighting technician18%
  4. 593Nail technician18%
  5. 594Veterinary technician18%
  6. 595Actor17%