Automation index
How much of a Special-education teacher’s job can AI already do?
An IEP comes earlier. Adapting so they are really in the group do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Special-education teacher
22%
AI can already do 22% of this job.
#416 / 753
View rankingSpecial-education teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
IEP, aims and coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Classroom, support and the one who overflows.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Family, the report and not selling miracles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Yard, inclusion and the one left alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Staff, resources and fighting for the place.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Really in the group, not on paper.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- IEP
- classroom support
- family reports
- inclusion
- the yard
- resources
- places
- overflow
Sources for this job· O*NET 25-2051.00· ESCO/ISCO 2352
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115