Automation index
How much of a Special-education teacher’s job can AI already do?
An IEP comes earlier. Adapting so they are really in the group do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Special-education teacher
22%
AI can already do 22% of this job.
#409 / 743
View rankingSpecial-education teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
IEP, aims and coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Classroom, support and the one who overflows.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Family, the report and not selling miracles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Yard, inclusion and the one left alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Staff, resources and fighting for the place.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Really in the group, not on paper.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- IEP
- classroom support
- family reports
- inclusion
- the yard
- resources
- places
- overflow
Sources for this job· O*NET 25-2051.00· ESCO/ISCO 2352
IS WORK OVER?
Corrosion engineer
22%
#387 / 743
View rankingCorrosion engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Thicknesses, the map and the coupon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the pipe and the one that is thin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cathode, the protection and the one that will not take.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shutdown, the coating and not painting over rust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the rush and not leaving the thin one in service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop before it goes, and not painting over it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- thicknesses
- corrosion maps
- cathodic protection
- coatings
- thin pipes
- shutdowns
- rust
- coupons
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145