Automation index
How much of a Special-education teacher’s job can AI already do?
An IEP comes earlier. Adapting so they are really in the group do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Special-education teacher
22%
AI can already do 22% of this job.
#349 / 633
View rankingSpecial-education teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
IEP, aims and coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Classroom, support and the one who overflows.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Family, the report and not selling miracles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Yard, inclusion and the one left alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Staff, resources and fighting for the place.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Really in the group, not on paper.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- IEP
- classroom support
- family reports
- inclusion
- the yard
- resources
- places
- overflow
Sources for this job· O*NET 25-2051.00· ESCO/ISCO 2352
IS WORK OVER?
Structural engineer
26%
#204 / 633
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142