Automation index
How much of a Special-education teacher’s job can AI already do?
An IEP comes earlier. Adapting so they are really in the group do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Special-education teacher
22%
AI can already do 22% of this job.
#349 / 633
View rankingSpecial-education teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
IEP, aims and coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Classroom, support and the one who overflows.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Family, the report and not selling miracles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Yard, inclusion and the one left alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Staff, resources and fighting for the place.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Really in the group, not on paper.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- IEP
- classroom support
- family reports
- inclusion
- the yard
- resources
- places
- overflow
Sources for this job· O*NET 25-2051.00· ESCO/ISCO 2352
IS WORK OVER?
Well driller
19%
#534 / 633
View rankingWell driller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Location, permit and the progress log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drill, case and the collapse.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Mud, samples and the geological log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Yield test, pump and the water analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The owner, the neighbour and the well that will not yield.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean water, and not leaving a blind well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill wells
- case
- yield test
- drilling mud
- geological log
- samples
- well pumps
- drilling permits
Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113