Automation index
How much of a Speech therapist’s job can AI already do?
A session plan and some drills come earlier. Sitting with a child who does not speak, and with their mother, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Speech therapist
19%
AI can already do 19% of this job.
#605 / 743
View rankingSpeech therapist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reports, session plans and materials.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 35% | +6.3 |
Standardised assessments and records.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
In-person therapy of speech, voice or swallow.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Guide family and school.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Coordinate with doctor, ENT and teachers.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
Adjust the plan when the patient stalls.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Reports, session plans and materials
- Standardised assessments and records
- Guide family and school
- Coordinate with doctor, ENT and teachers
- Adjust the plan when the patient stalls
- logopeda
- speech therapist
- fonoaudiologo
Sources for this job· O*NET 29-1127.00· ESCO/ISCO 2266
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142