Automation index
How much of a Sporting director’s job can AI already do?
A squad map comes earlier. Signing without breaking the dressing room do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Sporting director
27%
AI can already do 27% of this job.
#156 / 743
View rankingSporting director
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Squad, wages and financial fair play.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Signings, scouting and the one who does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Coach, the project and the one who burns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Board, the fans and not selling smoke.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The injury, the window and not papering over.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign well, and not breaking the dressing room.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- squad
- signings
- fair play
- scouting
- wages
- the project
- dressing room
- the window
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142