IS WORK OVER?

Automation index

How much of a Sporting director’s job can AI already do?

A squad map comes earlier. Signing without breaking the dressing room do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Sporting director

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Squad, wages and financial fair play.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Signings, scouting and the one who does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Coach, the project and the one who burns.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Board, the fans and not selling smoke.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The injury, the window and not papering over.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign well, and not breaking the dressing room.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • squad
  • signings
  • fair play
  • scouting
  • wages
  • the project
  • dressing room
  • the window

Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 153Hotel manager27%
  2. 154Spa manager27%
  3. 155Thesis supervisor27%
  4. 157Curriculum designer27%
  5. 158Instructional designer27%
  6. 159Personal trainer27%