IS WORK OVER?

Automation index

How much of a Stagehand’s job can AI already do?

A move plot comes earlier. Changing the set in the black without taking anyone down do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Stagehand

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plot, marks and the weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Change, blackout and the one who is late.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Loads, pulleys and the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Technical rehearsal and the one who walks the light.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The show, the surprise and not improvising loads.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Take nobody down, and the change on time.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • blackout changes
  • stage marks
  • pulleys
  • loads
  • technical rehearsal
  • sets
  • the show
  • weights

Sources for this job· O*NET 27-2099.00· ESCO/ISCO 3435

Power-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-point, parameters and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Room, alarms and the one that trips.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Start, stop and not skipping the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, isolation and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the grid and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The set-point, and not tripping.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • set-points
  • control room
  • plant SOP
  • starts
  • isolations
  • alarms
  • dispatch
  • the grid

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Analyse my job

Jobs with similar scores

  1. 542Weaver19%
  2. 543Occupational therapist19%
  3. 544Tractor driver19%
  4. 546Valet19%
  5. 547Glassblower19%
  6. 548Stained-glass artist19%