IS WORK OVER?

Automation index

How much of a Stagehand’s job can AI already do?

A move plot comes earlier. Changing the set in the black without taking anyone down do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Stagehand

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plot, marks and the weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Change, blackout and the one who is late.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Loads, pulleys and the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Technical rehearsal and the one who walks the light.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The show, the surprise and not improvising loads.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Take nobody down, and the change on time.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • blackout changes
  • stage marks
  • pulleys
  • loads
  • technical rehearsal
  • sets
  • the show
  • weights

Sources for this job· O*NET 27-2099.00· ESCO/ISCO 3435

Shutter installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order and the box that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Box, axle and the motor in the opening.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tape, slats and the one that derails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Program the remote and the limit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the inner courtyard and not scratching the frame.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it runs true, and not leaving a lame box.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure shutters
  • fit boxes
  • shutter motors
  • slats
  • limit switches
  • tape
  • program remotes
  • axles

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Analyse my job

Jobs with similar scores

  1. 552Weaver19%
  2. 553Occupational therapist19%
  3. 554Tractor driver19%
  4. 556Valet19%
  5. 557Glassblower19%
  6. 558Stained-glass artist19%