IS WORK OVER?

Automation index

How much of a Stagehand’s job can AI already do?

A move plot comes earlier. Changing the set in the black without taking anyone down do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Stagehand

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plot, marks and the weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Change, blackout and the one who is late.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Loads, pulleys and the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Technical rehearsal and the one who walks the light.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The show, the surprise and not improvising loads.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Take nobody down, and the change on time.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • blackout changes
  • stage marks
  • pulleys
  • loads
  • technical rehearsal
  • sets
  • the show
  • weights

Sources for this job· O*NET 27-2099.00· ESCO/ISCO 3435

Well driller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Location, permit and the progress log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drill, case and the collapse.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Mud, samples and the geological log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Yield test, pump and the water analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The owner, the neighbour and the well that will not yield.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean water, and not leaving a blind well.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drill wells
  • case
  • yield test
  • drilling mud
  • geological log
  • samples
  • well pumps
  • drilling permits

Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113

Analyse my job

Jobs with similar scores

  1. 552Weaver19%
  2. 553Occupational therapist19%
  3. 554Tractor driver19%
  4. 556Valet19%
  5. 557Glassblower19%
  6. 558Stained-glass artist19%