Automation index
How much of a Stained-glass artist’s job can AI already do?
A window cartoon comes earlier. Leading, soldering without letting the air in do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Stained-glass artist
19%
AI can already do 19% of this job.
#677 / 763
View rankingStained-glass artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cartoon, cut and the glass colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lead, solder and the one that opens.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cement, clean and the weatherseal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Opening, the church and the scaffold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The restoration, the original and not inventing extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No air in, and firm lead.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- window cartoon
- lead
- solder
- cement
- cut glass
- openings
- restore windows
- weatherseal
Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7315
IS WORK OVER?
Aerospace technician
19%
#657 / 763
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115