Automation index
How much of a Station master’s job can AI already do?
A train graph comes earlier. Leaving on time without meeting on the same line do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Station master
23%
AI can already do 23% of this job.
#302 / 623
View rankingStation master
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Graph, orders and the station log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Platforms, the crossing and the late train.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Staff, shifts and the ticket-office gap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Incident, passengers and the PA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Works, closures and leaving nobody on the platform.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they do not meet, and signing the graph.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- train graph
- orders
- platforms
- ticket office
- PA
- line crossings
- station shifts
- station logs
Sources for this job· O*NET 53-4031.00· ESCO/ISCO 4323
IS WORK OVER?
Structural engineer
26%
#204 / 623
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142