IS WORK OVER?

Automation index

How much of a Stonemason’s job can AI already do?

A template and a cut come earlier. Fitting a worktop without a lip does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Stonemason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Templates, cutting lists and stone orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Cut, polish and edge.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Set, level and seal on site.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Client, kitchen and bath.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Shop, resins and repairs.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Not delivering a piece that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Templates, cutting lists and stone orders
  • Cut, polish and edge
  • Set, level and seal on site
  • Client, kitchen and bath
  • Shop, resins and repairs
  • Not delivering a piece that does not fit
  • marmolista

Sources for this job· O*NET 47-2022.00· ESCO/ISCO 7113

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 578Gardener18%
  2. 579Train driver18%
  3. 580Shellfish gatherer18%
  4. 582Port crane operator18%
  5. 583Tower crane operator18%
  6. 584Excavator operator18%