Automation index
How much of a Strength and conditioning coach’s job can AI already do?
A load GPS comes earlier. Getting them ready without breaking them in the gym do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Strength and conditioning coach
22%
AI can already do 22% of this job.
#365 / 633
View rankingStrength and conditioning coach
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Load, GPS and the microcycle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Gym, the pattern and the one who cheats.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rehab, the injured and not rushing the return.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Report, the manager and the fight over minutes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The peak, pre-season and not grinding them.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Ready, and not broken.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load
- training GPS
- microcycles
- rehab
- movement pattern
- pre-season
- reports to the manager
- the gym
Sources for this job· O*NET 29-9091.00· ESCO/ISCO 3423
IS WORK OVER?
Telecom engineer
25%
#235 / 633
View rankingTelecom engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Size, simulate and plan radio and fibre.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Projects, permits and sites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Field, measurements and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Incidents, NOC and operators.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, spectrum and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a town dark from a mistake.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Size, simulate and plan radio and fibre
- Projects, permits and sites
- Field, measurements and commissioning
- Incidents, NOC and operators
- Rules, spectrum and documentation
- Not leaving a town dark from a mistake
- ingeniero de telecomunicaciones
- telecom engineer
Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153