IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Acupuncturist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
History, tongue, pulse and a first map.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Needle, manipulate and remove.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Explain, dose and combine with moxa.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Charts and session progress.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Hygiene, single-use kit and the room.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not over-needling or treating the wrong person.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • History, tongue, pulse and a first map
  • Needle, manipulate and remove
  • Explain, dose and combine with moxa
  • Charts and session progress
  • Hygiene, single-use kit and the room
  • acupuntor
  • acupuntura
  • acupuncturist

Sources for this job· O*NET 29-1291.00· ESCO/ISCO 3230

Analyse my job

Jobs with similar scores

  1. 201Statistician26%
  2. 202Cultural manager26%
  3. 203Screenwriter26%
  4. 205Process engineer26%
  5. 206Midwife26%
  6. 207Penetration tester26%