IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Army officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Order, the map and the section.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the one who lags and the one who jumps.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Live fire, safety and not playing brave.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Logistics, the meal and the one that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Command, the pressure and not dressing casualties.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Get them all out, and not losing one.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • operations orders
  • sections
  • the map
  • live fire
  • meals
  • casualties
  • command
  • field safety

Sources for this job· O*NET 55-1015.00· ESCO/ISCO 0110

Analyse my job

Jobs with similar scores

  1. 228Statistician26%
  2. 229Cultural manager26%
  3. 230Screenwriter26%
  4. 232Process engineer26%
  5. 233Midwife26%
  6. 234Penetration tester26%