IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Cost engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, rates and the budget.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the variance and the one that was not logged.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Change, the extra and not giving it away.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Close, the dispute and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Management, the bid and not selling the reckless one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The real number, and not the reckless bid.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measures
  • unit rates
  • variances
  • extras
  • disputes
  • reckless bids
  • works budgets
  • closes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 237Statistician26%
  2. 238Cultural manager26%
  3. 239Screenwriter26%
  4. 241Process engineer26%
  5. 242Midwife26%
  6. 243Penetration tester26%