Automation index
How much of a Structural engineer’s job can AI already do?
A frame model comes earlier. Signing that it takes wind and quake do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Structural engineer
26%
AI can already do 26% of this job.
#204 / 633
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Drafter
26%
#197 / 633
View rankingDrafter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimension and issue sheets.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Quantities, legends and revisions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coordinate with architect, engineer and site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drawing standards, stamps and issue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Archive, BIM and clashes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not issuing a drawing nobody can read.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model, dimension and issue sheets
- Quantities, legends and revisions
- Drawing standards, stamps and issue
- Archive, BIM and clashes
- Not issuing a drawing nobody can read
- delineante
- proyectista
- drafter
- cad technician
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118