IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Game developer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Prototype, the loop and the input.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Physics, the bug and the one that teleports.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Build, the platform and the one that will not ship.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Frame, 30 and not leaving it at 8.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The designer, the fun and not cutting what it feels.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it plays, and not leaving the frame at 8.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • game prototypes
  • game loop
  • input
  • builds
  • frames
  • physics bugs
  • platforms
  • write game code

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 247Statistician26%
  2. 248Cultural manager26%
  3. 249Screenwriter26%
  4. 251Process engineer26%
  5. 252Midwife26%
  6. 253Penetration tester26%