IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

HVAC engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Loads, flows and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the duct and the one they crushed.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Commissioning, the balance and the room that sweats.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Noise, the grille and not leaving the whistle.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the saving and not killing the fresh air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not sweat, and not oversizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load calcs
  • air flows
  • ducts
  • balancing
  • grilles
  • fresh air
  • whistles
  • HVAC plant

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 240Statistician26%
  2. 241Cultural manager26%
  3. 242Screenwriter26%
  4. 244Process engineer26%
  5. 245Midwife26%
  6. 246Penetration tester26%