Automation index
How much of a Structural engineer’s job can AI already do?
A frame model comes earlier. Signing that it takes wind and quake do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Structural engineer
26%
AI can already do 26% of this job.
#204 / 623
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Lift technician
20%
#463 / 623
View rankingLift technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnosis, codes and the lift history.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Shaft, pit and the cabin rescue.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Service, tensioning and the industry report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Modernise, doors and the limit switch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The residents, the porter and the night fault.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Get the person out, and sign the service.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cabin rescue
- service lifts
- tension cables
- fault codes
- shaft pit
- cabin doors
- industry report
- modernise lifts
Sources for this job· O*NET 47-4021.00· ESCO/ISCO 7412