IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Lift technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagnosis, codes and the lift history.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Shaft, pit and the cabin rescue.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Service, tensioning and the industry report.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Modernise, doors and the limit switch.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The residents, the porter and the night fault.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get the person out, and sign the service.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cabin rescue
  • service lifts
  • tension cables
  • fault codes
  • shaft pit
  • cabin doors
  • industry report
  • modernise lifts

Sources for this job· O*NET 47-4021.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 201Statistician26%
  2. 202Cultural manager26%
  3. 203Screenwriter26%
  4. 205Process engineer26%
  5. 206Midwife26%
  6. 207Penetration tester26%