Automation index
How much of a Structural engineer’s job can AI already do?
A frame model comes earlier. Signing that it takes wind and quake do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Structural engineer
26%
AI can already do 26% of this job.
#204 / 633
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Logistics analyst
28%
#79 / 633
View rankingLogistics analyst
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Costs, OTIF and the dashboard.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Simulate network, warehouses and the what-if.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Ops, dirty data and going down to the dock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, the board and the cut that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The haulier, the contract and not breaking the service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
A real saving, and not dressing OTIF.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- logistics costs
- OTIF
- simulate network
- what-if
- dirty data
- haulage contracts
- dashboards
- network cuts
Sources for this job· O*NET 13-1081.00· ESCO/ISCO 2421