IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Miner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, blast plans and sensors.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Logged maintenance and mine CMMS.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Drill, load and extract.
Estimate

No public source provides a precise figure. This is our estimate.

24%10%+2.4
Support, ventilation and water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, gases and evacuation.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Shift, partner and not getting casual.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, blast plans and sensors
  • Logged maintenance and mine CMMS
  • Drill, load and extract
  • Support, ventilation and water
  • Safety, gases and evacuation
  • Shift, partner and not getting casual
  • minero
  • miner
  • interior de mina

Sources for this job· O*NET 47-5041.00· ESCO/ISCO 8111

Analyse my job

Jobs with similar scores

  1. 201Statistician26%
  2. 202Cultural manager26%
  3. 203Screenwriter26%
  4. 205Process engineer26%
  5. 206Midwife26%
  6. 207Penetration tester26%