Automation index
How much of a Structural engineer’s job can AI already do?
A frame model comes earlier. Signing that it takes wind and quake do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Structural engineer
26%
AI can already do 26% of this job.
#204 / 633
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Product owner
27%
#171 / 633
View rankingProduct owner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Write stories, criteria and backlog.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 50% | +11 |
Maps, roadmaps and release notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Refine with engineering and design.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Talk to users and stakeholders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Prioritise, cut scope and say no.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Accept the increment and own the value.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Write stories, criteria and backlog
- Maps, roadmaps and release notes
- Refine with engineering and design
- Talk to users and stakeholders
- Prioritise, cut scope and say no
- Accept the increment and own the value
- product owner
- po agil
Sources for this job· O*NET 15-1199.09· ESCO/ISCO 2519