IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Analyse my job

Jobs with similar scores

  1. 201Statistician26%
  2. 202Cultural manager26%
  3. 203Screenwriter26%
  4. 205Process engineer26%
  5. 206Midwife26%
  6. 207Penetration tester26%