Automation index
How much of a Structural engineer’s job can AI already do?
A frame model comes earlier. Signing that it takes wind and quake do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Structural engineer
26%
AI can already do 26% of this job.
#204 / 623
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Rebar worker
17%
#580 / 623
View rankingRebar worker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cutting list, diameters and steel order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Cut, bend and tie rebar.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Slabs, columns and starter bars.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, crane and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, kilos and extras.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving cover too short.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Cutting list, diameters and steel order
- Cut, bend and tie rebar
- Slabs, columns and starter bars
- Site, crane and safety
- Logs, kilos and extras
- Not leaving cover too short
- ferrallista
- armador de hierro
- rebar
Sources for this job· O*NET 47-2171.00· ESCO/ISCO 7214