IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Scrum master

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Facilitate ceremonies, boards and notes.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Flow metrics and impediment reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Team coaching and internal conflict.
Estimate

No public source provides a precise figure. This is our estimate.

18%15%+2.7
Protect the sprint from interruptions.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Train PO and managers in the method.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Change the system, not just the ritual.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Facilitate ceremonies, boards and notes
  • Flow metrics and impediment reports
  • Team coaching and internal conflict
  • Protect the sprint from interruptions
  • Train PO and managers in the method
  • Change the system, not just the ritual
  • scrum master
  • agile coach

Sources for this job· O*NET 13-1111.00· ESCO/ISCO 2421

Analyse my job

Jobs with similar scores

  1. 201Statistician26%
  2. 202Cultural manager26%
  3. 203Screenwriter26%
  4. 205Process engineer26%
  5. 206Midwife26%
  6. 207Penetration tester26%