Automation index
How much of a Structural engineer’s job can AI already do?
A frame model comes earlier. Signing that it takes wind and quake do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Structural engineer
26%
AI can already do 26% of this job.
#204 / 623
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Social integrator
22%
#344 / 623
View rankingSocial integrator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Pathways, reports and case coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Go along in the street, the flat and the missed appointment.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Network, resources and fighting for a place.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Group, conflict and the one who walks out.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Family, social services and the note to the judge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The bond, and the case not falling over.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- social support
- insertion pathways
- mediate conflict
- refer to services
- street work
- social reports
- coordinate cases
- group workshops
Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635