IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Switchboard operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Board, destinations and the shift.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The call, the one who is out and the message.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Emergencies, the anger and not losing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Directory, changes and not putting through wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the queues and not hanging up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Put it through, and not hanging up on the one who waits.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switchboard
  • destinations
  • messages
  • directory
  • call queues
  • emergencies
  • telephony shifts
  • extension changes

Sources for this job· O*NET 43-2021.00· ESCO/ISCO 4223

Analyse my job

Jobs with similar scores

  1. 201Statistician26%
  2. 202Cultural manager26%
  3. 203Screenwriter26%
  4. 205Process engineer26%
  5. 206Midwife26%
  6. 207Penetration tester26%