IS WORK OVER?

Automation index

How much of a Structural engineer’s job can AI already do?

A frame model comes earlier. Signing that it takes wind and quake do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Varnisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Colour cards, ranges and orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Sand, stain, apply and dry.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Booth, filters and dust.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Cabinetmaker, deadlines and touch-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Repairs in the home and on site.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not delivering a piece with orange peel.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Colour cards, ranges and orders
  • Sand, stain, apply and dry
  • Booth, filters and dust
  • Cabinetmaker, deadlines and touch-up
  • Repairs in the home and on site
  • Not delivering a piece with orange peel
  • barnizador
  • lacador
  • varnisher

Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7522

Analyse my job

Jobs with similar scores

  1. 201Statistician26%
  2. 202Cultural manager26%
  3. 203Screenwriter26%
  4. 205Process engineer26%
  5. 206Midwife26%
  6. 207Penetration tester26%