Automation index
How much of a Stucco artist’s job can AI already do?
A cornice mould comes earlier. Laying stucco without it cracking do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Stucco artist
19%
AI can already do 19% of this job.
#591 / 743
View rankingStucco artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Mould, mix and the set-out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lay, comb and the one that sags.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Moulding, the junction and the corner.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drying, crack and the touch-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The high ceiling, the scaffold and not loading extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No crack, and a clean junction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stucco
- cornices
- mouldings
- comb
- junctions
- cracks
- scaffold
- ceiling set-out
Sources for this job· O*NET 47-2161.00· ESCO/ISCO 7123
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142