Automation index
How much of a Stucco artist’s job can AI already do?
A cornice mould comes earlier. Laying stucco without it cracking do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Stucco artist
19%
AI can already do 19% of this job.
#591 / 743
View rankingStucco artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Mould, mix and the set-out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lay, comb and the one that sags.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Moulding, the junction and the corner.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drying, crack and the touch-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The high ceiling, the scaffold and not loading extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No crack, and a clean junction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stucco
- cornices
- mouldings
- comb
- junctions
- cracks
- scaffold
- ceiling set-out
Sources for this job· O*NET 47-2161.00· ESCO/ISCO 7123
IS WORK OVER?
Control engineer
22%
#386 / 743
View rankingControl engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PID, tune and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the swing and the one that runs away.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Mode, manual and not leaving it for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Alarm, the interlock and not silencing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the recipe and not changing blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not swing, and not leaving manual for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- PID
- tune
- swings
- manual mode
- interlocks
- recipes
- control models
- not silence alarms
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149