Automation index
How much of a Stucco artist’s job can AI already do?
A cornice mould comes earlier. Laying stucco without it cracking do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Stucco artist
19%
AI can already do 19% of this job.
#496 / 633
View rankingStucco artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Mould, mix and the set-out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lay, comb and the one that sags.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Moulding, the junction and the corner.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drying, crack and the touch-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The high ceiling, the scaffold and not loading extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No crack, and a clean junction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stucco
- cornices
- mouldings
- comb
- junctions
- cracks
- scaffold
- ceiling set-out
Sources for this job· O*NET 47-2161.00· ESCO/ISCO 7123
IS WORK OVER?
Mining engineer
22%
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146