IS WORK OVER?

Automation index

How much of a Stucco artist’s job can AI already do?

A cornice mould comes earlier. Laying stucco without it cracking do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Stucco artist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Mould, mix and the set-out.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Lay, comb and the one that sags.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Moulding, the junction and the corner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drying, crack and the touch-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The high ceiling, the scaffold and not loading extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No crack, and a clean junction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stucco
  • cornices
  • mouldings
  • comb
  • junctions
  • cracks
  • scaffold
  • ceiling set-out

Sources for this job· O*NET 47-2161.00· ESCO/ISCO 7123

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 493Cabinetmaker19%
  2. 494Swimming coach19%
  3. 495Tennis coach19%
  4. 497Kayak guide19%
  5. 498Mountain guide19%
  6. 499Farrier19%