Automation index
How much of a Stucco artist’s job can AI already do?
A cornice mould comes earlier. Laying stucco without it cracking do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Stucco artist
19%
AI can already do 19% of this job.
#599 / 753
View rankingStucco artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Mould, mix and the set-out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lay, comb and the one that sags.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Moulding, the junction and the corner.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drying, crack and the touch-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The high ceiling, the scaffold and not loading extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No crack, and a clean junction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stucco
- cornices
- mouldings
- comb
- junctions
- cracks
- scaffold
- ceiling set-out
Sources for this job· O*NET 47-2161.00· ESCO/ISCO 7123
IS WORK OVER?
Substation technician
19%
#660 / 753
View rankingSubstation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Switching, the sheet and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bay, the earth and not going in without it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Oil, the analysis and the one that bites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fault, the disconnector and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Control and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Open the right one, and not going in unearthed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switching
- substation sheets
- earths
- bays
- oil
- lockouts
- disconnectors
- not go in unearthed
Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113