Automation index
How much of a Substation technician’s job can AI already do?
A switching sheet comes earlier. Opening the right one without going in unearthed do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Substation technician
19%
AI can already do 19% of this job.
#670 / 763
View rankingSubstation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Switching, the sheet and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bay, the earth and not going in without it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Oil, the analysis and the one that bites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fault, the disconnector and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Control and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Open the right one, and not going in unearthed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switching
- substation sheets
- earths
- bays
- oil
- lockouts
- disconnectors
- not go in unearthed
Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113
IS WORK OVER?
Lighting engineer
27%
#183 / 763
View rankingLighting engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calc, Dialux and the standard.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the point and the one that was not put in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Night, the glare and the pedestrian.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Saving, the LED and not leaving the crossing dark.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The council, the complaint and not dressing the lux.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That you can see, and not glaring.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Dialux
- lux
- glare
- lighting points
- LED
- crossings
- lighting standards
- calcs
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149