Automation index
How much of a Surgeon’s job can AI already do?
Surgeons diagnose, operate and own the surgical act.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Surgeon
14%
AI can already do 14% of this job.
#637 / 643
View rankingSurgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Notes and planningEstimateNo public source provides a precise figure. This is our estimate. | 20% | 35% | +7 |
Imaging and prepEstimateNo public source provides a precise figure. This is our estimate. | 15% | 25% | +3.8 |
Operating theatreEstimateNo public source provides a precise figure. This is our estimate. | 50% | 4% | +2 |
Call and consentEstimateNo public source provides a precise figure. This is our estimate. | 15% | 8% | +1.2 |
| Total | 100% | 14% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- care for patients
- diagnose
- nursing care
- clinical notes
- manage research data
- operate open source software
- demonstrate disciplinary expertise
- think abstractly
- manage personal professional development
- perform project management
Sources for this job· O*NET 29-1249.00· ESCO/ISCO 2212
IS WORK OVER?
Aerospace engineer
25%
#233 / 643
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144