Automation index
How much of a Surgical technologist’s job can AI already do?
A checklist and a count come earlier. The clamp on time, and not breaking sterility, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Surgical technologist
19%
AI can already do 19% of this job.
#649 / 743
View rankingSurgical technologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checklist, tray and swab count.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set the table, pass and scrub.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Watch sterility, lines and the patient.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Coordinate with surgeon, anaesthetic and porter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Notes, implants and kit records.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shifts, on-call and not leaving a swab inside.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Checklist, tray and swab count
- Set the table, pass and scrub
- Watch sterility, lines and the patient
- Notes, implants and kit records
- tecnico de quirofano
- instrumentista
- surgical technologist
Sources for this job· O*NET 29-2055.00· ESCO/ISCO 3211
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142