Automation index
How much of a Surgical technologist’s job can AI already do?
A checklist and a count come earlier. The clamp on time, and not breaking sterility, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Surgical technologist
19%
AI can already do 19% of this job.
#541 / 633
View rankingSurgical technologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checklist, tray and swab count.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set the table, pass and scrub.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Watch sterility, lines and the patient.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Coordinate with surgeon, anaesthetic and porter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Notes, implants and kit records.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shifts, on-call and not leaving a swab inside.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Checklist, tray and swab count
- Set the table, pass and scrub
- Watch sterility, lines and the patient
- Notes, implants and kit records
- tecnico de quirofano
- instrumentista
- surgical technologist
Sources for this job· O*NET 29-2055.00· ESCO/ISCO 3211
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142