IS WORK OVER?

Automation index

How much of a Surgical technologist’s job can AI already do?

A checklist and a count come earlier. The clamp on time, and not breaking sterility, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Surgical technologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checklist, tray and swab count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set the table, pass and scrub.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Watch sterility, lines and the patient.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Coordinate with surgeon, anaesthetic and porter.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Notes, implants and kit records.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shifts, on-call and not leaving a swab inside.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Checklist, tray and swab count
  • Set the table, pass and scrub
  • Watch sterility, lines and the patient
  • Notes, implants and kit records
  • tecnico de quirofano
  • instrumentista
  • surgical technologist

Sources for this job· O*NET 29-2055.00· ESCO/ISCO 3211

Stagehand

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plot, marks and the weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Change, blackout and the one who is late.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Loads, pulleys and the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Technical rehearsal and the one who walks the light.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The show, the surprise and not improvising loads.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Take nobody down, and the change on time.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • blackout changes
  • stage marks
  • pulleys
  • loads
  • technical rehearsal
  • sets
  • the show
  • weights

Sources for this job· O*NET 27-2099.00· ESCO/ISCO 3435

Analyse my job

Jobs with similar scores

  1. 538Biogas technician19%
  2. 539Hydrogen technician19%
  3. 540Small-hydro technician19%
  4. 542Weaver19%
  5. 543Occupational therapist19%
  6. 544Tractor driver19%