IS WORK OVER?

Automation index

How much of a Surgical technologist’s job can AI already do?

A checklist and a count come earlier. The clamp on time, and not breaking sterility, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Surgical technologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checklist, tray and swab count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set the table, pass and scrub.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Watch sterility, lines and the patient.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Coordinate with surgeon, anaesthetic and porter.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Notes, implants and kit records.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shifts, on-call and not leaving a swab inside.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Checklist, tray and swab count
  • Set the table, pass and scrub
  • Watch sterility, lines and the patient
  • Notes, implants and kit records
  • tecnico de quirofano
  • instrumentista
  • surgical technologist

Sources for this job· O*NET 29-2055.00· ESCO/ISCO 3211

Textile engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Recipes, weaves and piece QC.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shop, looms and the warp break.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Supplier, cotton and the sustainability card.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Finishes, shrinkage and fastness tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The brand, the deadline and the colour that misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Ten thousand metres the same, and not hiding the bad yardage.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dye recipes
  • weaves
  • looms
  • colour fastness
  • shrinkage
  • piece card
  • warp
  • textile finishes

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 548Biogas technician19%
  2. 549Hydrogen technician19%
  3. 550Small-hydro technician19%
  4. 552Weaver19%
  5. 553Occupational therapist19%
  6. 554Tractor driver19%