IS WORK OVER?

Automation index

How much of a Surgical technologist’s job can AI already do?

A checklist and a count come earlier. The clamp on time, and not breaking sterility, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Surgical technologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checklist, tray and swab count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set the table, pass and scrub.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Watch sterility, lines and the patient.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Coordinate with surgeon, anaesthetic and porter.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Notes, implants and kit records.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shifts, on-call and not leaving a swab inside.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Checklist, tray and swab count
  • Set the table, pass and scrub
  • Watch sterility, lines and the patient
  • Notes, implants and kit records
  • tecnico de quirofano
  • instrumentista
  • surgical technologist

Sources for this job· O*NET 29-2055.00· ESCO/ISCO 3211

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 548Biogas technician19%
  2. 549Hydrogen technician19%
  3. 550Small-hydro technician19%
  4. 552Weaver19%
  5. 553Occupational therapist19%
  6. 554Tractor driver19%