Automation index
How much of a Surgical technologist’s job can AI already do?
A checklist and a count come earlier. The clamp on time, and not breaking sterility, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Surgical technologist
19%
AI can already do 19% of this job.
#551 / 643
View rankingSurgical technologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checklist, tray and swab count.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set the table, pass and scrub.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Watch sterility, lines and the patient.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Coordinate with surgeon, anaesthetic and porter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Notes, implants and kit records.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shifts, on-call and not leaving a swab inside.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Checklist, tray and swab count
- Set the table, pass and scrub
- Watch sterility, lines and the patient
- Notes, implants and kit records
- tecnico de quirofano
- instrumentista
- surgical technologist
Sources for this job· O*NET 29-2055.00· ESCO/ISCO 3211
IS WORK OVER?
Wastewater-plant operator
19%
#529 / 643
View rankingWastewater-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, process and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Basin, the sludge and the one that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Breakdown, the pump and at night.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Test, the discharge and not hiding the spike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The rain, the overflow and not opening extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come out clean, and the sludge in place.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- works flow
- sludge
- basins
- pumps
- discharges
- overflows
- plant logs
- final tests
Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132