Automation index
How much of a Surgical technologist’s job can AI already do?
A checklist and a count come earlier. The clamp on time, and not breaking sterility, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Surgical technologist
19%
AI can already do 19% of this job.
#551 / 643
View rankingSurgical technologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checklist, tray and swab count.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set the table, pass and scrub.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Watch sterility, lines and the patient.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Coordinate with surgeon, anaesthetic and porter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Notes, implants and kit records.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shifts, on-call and not leaving a swab inside.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Checklist, tray and swab count
- Set the table, pass and scrub
- Watch sterility, lines and the patient
- Notes, implants and kit records
- tecnico de quirofano
- instrumentista
- surgical technologist
Sources for this job· O*NET 29-2055.00· ESCO/ISCO 3211
IS WORK OVER?
Wind-turbine technician
19%
#546 / 643
View rankingWind-turbine technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SCADA, the code and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, the wind and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Nacelle, the oil and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rescue, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the access and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and the turbine running.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm SCADA
- climb the tower
- nacelle
- height rescue
- oils
- fault codes
- access
- wind
Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412