Automation index
How much of a Surveyor’s job can AI already do?
A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Surveyor
24%
AI can already do 24% of this job.
#289 / 643
View rankingSurveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Process stations, GNSS and drawings.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Reports, volumes and deliverables.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Measure in the field, stake and set out.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Coordinate with works and the site authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Read the ground when the model lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Owning a 3 cm error.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Process stations, GNSS and drawings
- Reports, volumes and deliverables
- Measure in the field, stake and set out
- Read the ground when the model lies
- Owning a 3 cm error
- topografo
- surveyor
- aparejador topografia
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165
IS WORK OVER?
Dosimetrist
22%
#336 / 643
View rankingDosimetrist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CT, contours and the plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Organ at risk, the curve and not overshooting.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Physics, the check and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fraction, the setup and the patient who is not the same.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The oncologist, the trade-off and not signing blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The tumour gets it, and the healthy organ does not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dose plans
- contours
- organs at risk
- dosimetry check
- fractions
- setup
- sim CT
- DVH curves
Sources for this job· O*NET 29-2036.00· ESCO/ISCO 3211