IS WORK OVER?

Automation index

How much of a Surveyor’s job can AI already do?

A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Drone pilot

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flight plan, NOTAM, ENAIRE and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Fly, frame, not lose the drone and land.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Deliver stills, video and a basic grade.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, batteries and the part that fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Client, briefing and what you can actually fly.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
AESA rules and liability for the flight.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fly drones
  • pilot UAS
  • flight planning
  • aerial shots
  • NOTAM
  • AESA permits
  • not lose the drone
  • grade aerial video

Sources for this job· O*NET 53-2012.00· ESCO/ISCO 3153

Analyse my job

Jobs with similar scores

  1. 281Hearing aid technician24%
  2. 282Job insertion technician24%
  3. 283Radiation therapist24%
  4. 285Urban planner24%
  5. 286Allergist23%
  6. 287Anthropologist23%