Automation index
How much of a Surveyor’s job can AI already do?
A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Surveyor
24%
AI can already do 24% of this job.
#284 / 633
View rankingSurveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Process stations, GNSS and drawings.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Reports, volumes and deliverables.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Measure in the field, stake and set out.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Coordinate with works and the site authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Read the ground when the model lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Owning a 3 cm error.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Process stations, GNSS and drawings
- Reports, volumes and deliverables
- Measure in the field, stake and set out
- Read the ground when the model lies
- Owning a 3 cm error
- topografo
- surveyor
- aparejador topografia
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165
IS WORK OVER?
Environmental engineer
25%
#229 / 633
View rankingEnvironmental engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model emissions, discharges and noise.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Impact studies, permits and specs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Field, sampling and treatment plants.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Authorities, public and objections.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, reports and monitoring.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not dressing an environmental figure.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model emissions, discharges and noise
- Impact studies, permits and specs
- Field, sampling and treatment plants
- Authorities, public and objections
- Rules, reports and monitoring
- Not dressing an environmental figure
- ingeniero ambiental
- environmental engineer
Sources for this job· O*NET 17-2081.00· ESCO/ISCO 2143