IS WORK OVER?

Automation index

How much of a Surveyor’s job can AI already do?

A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Landscape architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, species and the irrigation.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Works, levels and the tree that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Soil, climate and not planting what will not last.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Client, maintenance and what they will not water.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
August, the drought and the yes to xeriscape.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is lived in, and not dying in August.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • planting plans
  • species
  • garden irrigation
  • xeriscape
  • works levels
  • soil
  • garden maintenance
  • trees

Sources for this job· O*NET 17-1012.00· ESCO/ISCO 2162

Analyse my job

Jobs with similar scores

  1. 286Hearing aid technician24%
  2. 287Job insertion technician24%
  3. 288Radiation therapist24%
  4. 290Urban planner24%
  5. 291Allergist23%
  6. 292Anthropologist23%