IS WORK OVER?

Automation index

How much of a Surveyor’s job can AI already do?

A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 281Hearing aid technician24%
  2. 282Job insertion technician24%
  3. 283Radiation therapist24%
  4. 285Urban planner24%
  5. 286Allergist23%
  6. 287Anthropologist23%