Automation index
How much of a Surveyor’s job can AI already do?
A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Surveyor
24%
AI can already do 24% of this job.
#284 / 633
View rankingSurveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Process stations, GNSS and drawings.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Reports, volumes and deliverables.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Measure in the field, stake and set out.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Coordinate with works and the site authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Read the ground when the model lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Owning a 3 cm error.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Process stations, GNSS and drawings
- Reports, volumes and deliverables
- Measure in the field, stake and set out
- Read the ground when the model lies
- Owning a 3 cm error
- topografo
- surveyor
- aparejador topografia
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165
IS WORK OVER?
Property valuer
24%
#280 / 633
View rankingProperty valuer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Comps, cadastre and a first value.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Visit, measurements and defects.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Report, photos and bank annexes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Client, lender and valuation deadlines.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Valuation rules and liability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not signing a flat that is not worth that.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Comps, cadastre and a first value
- Visit, measurements and defects
- Report, photos and bank annexes
- Client, lender and valuation deadlines
- Valuation rules and liability
- Not signing a flat that is not worth that
- tasador inmobiliario
- tasador
- property valuer
Sources for this job· O*NET 13-2023.00· ESCO/ISCO 3315