IS WORK OVER?

Automation index

How much of a Surveyor’s job can AI already do?

A digital set-out and a drawing come earlier. Driving stakes in the wind, and the building lining up, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Security engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Control, the risk and the ticket.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Hole, the patch and the one still open.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Exception, the deadline and not leaving it for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Identity, the privilege and not giving admin out of habit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The business, the rush and not opening the port 'for a moment'.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Close the hole, and not leaving the exception.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • security controls
  • patches
  • exceptions
  • privileges
  • ports
  • identities
  • not give admin
  • holes

Sources for this job· O*NET 15-1212.00· ESCO/ISCO 2529

Analyse my job

Jobs with similar scores

  1. 327Hearing aid technician24%
  2. 328Job insertion technician24%
  3. 329Radiation therapist24%
  4. 331Urban planner24%
  5. 332Allergist23%
  6. 333Anthropologist23%